Liberal High School VRF Installation Problem: Liberal School District was having issues keeping their high school building at a comfortable level for students and staff. Engineering Solutions Professionals (ESP) was hired to design a more efficient system. The old, inefficient water source heat pumps were the cause of the problem. Solution: Dean E. Norris was hired as the mechanical contractor to install a VRF system in the Liberal High School. As soon as the contract was signed by the school district, Dean E. Norris verified equipment and confirmed the tight construction schedule. Shortly thereafter, crews were onsite demoing the old equipment. We replaced 94 water source heat pumps with 94 VRF units. All of the electrical, ceiling rework, and insulation was subcontracted under us, and we coordinated these trades in conjunction with the mechanical work. Crews also installed 20 VRF...